Medibo cooperated with Jiangsu Huatian Construction Group to build the cast-in-place blind road project on Huanhu Road in Xuzhou.
The estimated length of the blind road was 500 meters and the width was 40 centimeters. The construction scope of the road section was designated by Party A and has been completed.
The 12 key urban construction projects released by the Xuzhou Urban Management Bureau in March included some progress of the Park Huanhu Road project: box culverts, earth-rock mixture filling, rainwater pipes, roadbeds, etc. achieve a considerable degree of completion.
At the time of “Golden September and Silver October”, the construction of the municipal blind road surface was imminent. Party A adopted the polymer cast-in-place King Kong tactile path solution to replace the traditional tactile paving.

Our dedicated team of writers is fueled by a passion for flooring paints, bringing you insightful and expertly crafted content that explores the world of vibrant colors, innovative textures, and transformative finishes. We will keep writing for you. Thank you for reading.