China-Russia Bridge Customs Toll Station: Ceramic Particle Pavement Project

In 2021, the Heihe Bridge ceramic particle pavement project resumption construction plan was put on the agenda.

In mid-July, when the conditions were ripe, the person in charge of the Medibo project led the construction team to continue to complete the remaining progress of the project.

The project was suspended for nearly two years mainly due to the epidemic, and the road conditions were not satisfactory.

After arriving at the Heihe construction site, Manager Pan of the engineering department of Medibo personally started to deal with the water, sediment, and dirt on the road and dried the corners with a spray gun.

Then waited for the logistics arrangement of Medibo polyurethane road adhesive (ceramic particle glue) to enter the site, and then started the construction work of the sprinkled ceramic particle technology. The paving of the red ceramic granules was completed after about two weeks.